Sam signs in and chooses the job: production order 1042, the packing operation. Sign in and choose your Workspace
The operation screen opens, showing the job and its status as Ready.
Sam taps Start. The status changes to Running and a timer begins.
Part way through, Sam records some output as boxes are completed. They might also post components they've used, record scrap, or read a note from planning.
The machine jams. Sam taps Stop and chooses a reason, Blade fault. The status becomes Stopped.
Maintenance fixes it. Sam taps Start and confirms the stop reason, and work carries on.
The order's finished. Sam records the last output, taps Stop and chooses the Prod. Order Complete stop reason, that identifies to Clever MES that the work is complete.
What each step does in Business Central
| Step | What operators do | What Business Central records |
| Start |
Taps Start. |
Logs the start. If the operation hadn't started before, it's set to In Progress (if your settings say so) and its Actual Start Date-Time is set. If the Workspace had been stopped, the stopped time is posted against the stop reason it was stopped with. |
| Output |
Enters a quantity and posts it. |
Posts output for the operation. On the last operation of the routing it posts to inventory, creating an output item ledger entry. On earlier operations it records capacity only. It also updates the routing line's Last Output Date-Time. Post output and scrap |
| Components |
Posts quantities used. |
Posts consumption against the production order components. Post components |
| Stop |
Taps Stop and chooses a reason. |
Logs the stop with its reason. The Workspace's time is posted as capacity. If it was the final stop for the job, the routing line is marked complete. |
| Exit |
Chooses an exit reason. |
Logs the exit and clears the Workspace so the next job can be chosen. |
Time, and why stops matter
While the operation is Running, the clock is counting run time. When it's Stopped, the clock for run time stops and a separate stop timer starts, recorded against the reason the operator chose. Reasons are either planned (a scheduled break) or unplanned (a fault or a shortage). That split is what lets supervisors see where time is really being lost. Analyse stop time
Some stop reasons have special meaning, set up in the “MES Setup” screen:
Prod. Order Complete: the operation has finished.
Setup Complete: setup is done and running is about to start.
End of Shift: the operator is finishing for now.
Stopping with the Prod. Order Complete or End of Shift reason also resets what the Workspace has selected, so the next person is asked who they are and what they're working on.
Operators and the log
Every action is logged in the “MES Workspace Log” screen, with the Workspace, the Terminal, the production order and operation, the operator and the reason. When more than one operator is signed in, each gets their own entries, which is how you can cost labour per person. Supervisors can open the log from the “Machine Center Card” screen, or use the “MES Unplanned Stop Time Analysis” screen.
Status colours
The operation screen shows the Workspace's state in a colour: Ready, Running, Stopped and Planned Stop, each of which you can customise in the “MES Setup” screen. Configure what operators see